SR1 Pic
NOAA logoNWS logo
NSSL logoUSGS Logo
Gap Fire Intensive Research Area

SBA Airport:12/1/08 to 2/28/2009

line decor
  
 
Intensive Operational Period (IOP) Status:

Friday 27 February 2009 9:00 AM CST

All Debris Flow operations are concluded for the 2008-2009 season.

SR1 arrived back at the NWC on February 27th.

-Jorgensen

 


Notes:

During data collection, quasi-real time SR1 Imagery of the base-level scans (dBZ & Vr) can be seen at http://smartr.metr.ou.edu/~smartr1.

There is a cell phone in SR1 (405-397-5686) for use during operations

   

Photographs

 
Burn Area Maps: Logistics: IOPs: Other Interesting Links: